Boutique hotel room with canopy bed and pine forest view, bespoke Balinese furniture delivered by container from Bali

One workshop in Kerobokan

Custom hotel
and villa furniture
from Bali, delivered
by container.

Ubud Atelier gives international clients one point of contact and direct access to Bali's finest workshop, which produces a full container on spec in 8 to 10 weeks and ships door to door in 12 to 20 weeks depending on destination.

Project scope

€25,000
Hospitality projects, typically one 20ft container
€10,000
Private residences: doors and windows sets, full outdoor sets, whole-house furnishing
8 to 10 weeks
Workshop production on spec

Building in Bali? Local delivery for villa developments.

Door to door, typically 12 to 20 weeks depending on destination

What the workshop makes

Five categories, all made to order.

Nothing is sold from stock. Each sheet gives the typical dimensional ranges, the materials and hardware, the minimum order and the lead time.

Gede, master craftsman, at work in the furniture workshop in Kerobokan, Bali

The workshop

One trusted partner.
A master of export quality.

Behind every project brought to Ubud Atelier is one workshop in Kerobokan, led by Gede. Before founding it in 2015, he spent more than a decade controlling export production quality for buyers in Japan, Australia and France, the final check before a container shipped overseas.

One brief. One point of contact. One container produced on spec by the workshop.

From 3D plan to installed room

Drawn in 3D, built in solid teak.

Villa Kaba-Kaba in Tabanan: ceilings, wall panelling, wardrobes, beds and doors, planned in 3D by the workshop, then built and installed by the same team.

3D plan

3D plan: slatted teak ceiling over the double-height living area, drawn in 3D then installed.

As built

Slatted teak ceiling over the double-height living area, drawn in 3D then installed.
Slatted teak ceiling over the double-height living area, drawn in 3D then installed.

How it works

From brief to delivery, one point of contact.

01

Brief & design

Before production

Technical drawings and finish samples approved piece by piece before anything is cut.

02

Production

8 to 10 weeks

Frames, finishing, then upholstery, with photo updates every three working days.

03

Quality control & loading

Before loading

Every piece inspected against the spec, photographed, then crated for sea freight.

04

Shipping & delivery

By destination

FCL from Benoa booked by the freight forwarder, with tracking, customs coordination and final-mile delivery.

Typical total: 12 to 20 weeks door to door depending on destination.

Reference projects

Selected projects, from Bali to Corsica.

Projects built by the workshop in Kerobokan for its clients in Bali and abroad. Two villas in Bali and a boutique guest house in Corsica.

Import estimator

Duty, taxes and lead time, per destination.

Pick one of 24 destinations and an order value: the estimator shows the customs duty, the local tax and the workshop's typical timeline for that route, with the date and source of every rate.

Materials

A-grade teak, natural rattan, volcanic stone.

A-grade plantation teak surface detail, sourced from certified Indonesian suppliers

A-Grade Teak

Natural rattan weave detail, hand-woven in the Bali workshop

Natural Rattan

Paras volcanic stone surface detail, hand-carved in Bali

Volcanic Stone

Start your project.

Share your scope, destination and timeline. Ubud Atelier comes back with the workshop's capacity and lead time within 48 hours.